Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Public Works will invest 10 million euros to improve the road to Cartagena to Almeria (03/09/2009)

A strong high porosity reduce the impact of the wheel with the asphalt and reduce noise pollution from vehicles that pass through

The Minister of Public Works and Planning, José Ballesta, reported today that regional government will invest 10.5 million euros in the draft of the highway that connects Cartagena with the province of Almeria (RM-332), in the section between Cuesta Blanca and Los Ruices.

In the presentation of this performance, which will result in significant improvement of communications in the southern part of the Region, the Minister was accompanied by the mayor of Cartagena, Pilar Barreiro.

José Ballesta indicated that this road is a cornerstone of the southern part of the region, connecting the cities of Cartagena and Mazarrón and Aguilas to Vera, in Almería province. "

Therefore, he added that "his conditioning improve road communications, particularly in the regions of Campo de Cartagena and the Upper and Lower Guadalentín."

The project involves the upgrading of 10 kilometers of track and construction of a new variant of eight miles, which will directly benefit the residents of some districts of Cartagena and Cuesta Blanca, Ports, Tallante and Los Ruices to enjoy better conditions environmental and acoustic.

Furthermore, the work will include planting by hydroseeding, a projection system for seed layers with little organic material than 50,000 shrubs, native species that cover a total area of 4.4 hectares with the aim of integrating the new stretch of road the flora of the areas crossed by it.

The regional government has already carried out actions in a specific section of this road, which links the town of Cartagena and Marfagones Mills, and continue working on the overall improvement of the same.

Also, José Ballesta said that "the Highways Agency has awarded the contract for upgrading the section that goes Eagles to the limit of the Region and will involve an investment of five million euros from the regional government."

Less noise pollution

Work on the RM-332 will begin before the end of the year on a stretch of 10 kilometers of track so that, according to the counselor, "will run a porous surface course reduces the impact of the wheel with the asphalt and reduces noise pollution, thus helping to improve the quality of life for residents of the area. "

This high porosity microsurfacing also facilitates water drainage and increase road safety in the days of rain, which will benefit the more than two million motorists who travel this road every year.

Also, José Ballesta said that "this project will eliminate a black dot in the kilometer 16 of the track, at the height of the port.

In addition, eight roundabouts will be built, renewed the road sign and new service roads provide access to adjoining properties. "

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información