Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

The indoor swimming Pozo Estrecho La Aljorra and will be finished later this year (19/06/2009)

The construction of indoor swimming Pozo Estrecho and La Palma are beginning to take shape.

Both facilities with which the City Council wants to bring this sport to 2,400 new users, must be completed before the end of the year.

Councillor for Sports, Alonso Gómez López, expressed his satisfaction with the progress of these two projects, included in Plan E, and recalled the offer in respect of indoor pools is the municipality: 3,000 places throughout the year and 2,000 in the street Ussel Guimbarda also throughout the year and an operating new competition is expected to convene during the month of July.

To this must be added the 2,000 places on offer during the summer in the pool at the Youth House for the younger kids to learn to swim.

The total supply of existing and under construction totaling approximately 9,400 spaces.

MUNICIPAL POOL COVER Aljorra

The future of The Aljorra indoor pool is part of the local sports center, located across the street from the Americo Vespucio Aljorra.

Includes a glass of 25 by 8.5 meters, a spa area for both sexes and a fitness center with separate locker rooms.

In its mating system is used in laminated wood arches and a dome pressostatic polyester, seeking greater use of solar power and encourage the exit to the outside during the summer.

Their duration is 6 months and the investment amounts to 1,700,000 euros.

MUNICIPAL POOL WELL COVER NARROW

Located inside the Sports Centre of the town, on the road to Pozo Estrecho Miranda, the project consists of the covering of the pool with a removable fabric tent 37 by 31 meters, with plywood plywood.

Also will install air conditioning vessel both water and environmental pool.

The pool will be connected to the locker room by the same set of tent fabric and connect the sewerage system of the pool with the general drainage network.

Also will be equipped with exterior lighting.

The period of performance of the work is also 6 months and its investment of 1,400,000 euros.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información