Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Approved the construction of a pumping station of sewage in the cairn Isla Plana (01/06/2009)

Local Government Board, which met this morning under the chairmanship of Mayor, Pilar Barreiro, has approved the draft of the Water Directorate of the Autonomous Region to build a network of pumping stations of wastewater, drives general collection and collection and transport of wastewater from Cairn to Wastewater Treatment Station of Isla Plana.

As pointed out by Councillor for Infrastructure and Services, José Vicente Albaladejo, budget about 2.5 billion euros and will allow the connection of the sewerage network of this development with the filter of Isla Plana, located in the Rambla de El Cañar .

The Board also approved the transfer to a local town hall about 400 square meters located in the basement of the building Stella Maris La Manga.

The transfer is made to the municipality as a result of the conversion of this former residential hotel establishment.

As explained by Town Planning, Joaquín Mowing, once the developers got a 15 per cent more floor area for being a tourist apartment block, now to become a second home, must yield to the City or demolish, Instead, current owner for the first option.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información