The refurbishment works to be undertaken during the coming months in the Calle Real, one of the most important actions included under the plan, cause that, from next Monday 18 May, enable the movement of vehicles in the central part this street.
Thus, in this first phase of works will be prohibited parking throughout the area adjacent to the Military Arsenal, which is enabled by two traffic lanes to allow vehicles to turn right into the plaza of Spain (northbound) or to the Port (southbound).
The central area of Royal Street, which from next Monday will be enabled as a rail, tarred and packaged finished last week, precisely in order to support the passage of vehicles.
This first phase will begin after completion of the previous water works installation of a drive and pipes that collect the water in the streets Carmen Tolosa Latour and the amount has surpassed one million euros.
In successive phases of the work will change this traffic management, installing appropriate signage.
As you will recall the main objective of this reorganization is the embodiment of the present driveway to the sidewalk of the buildings, creating a wide pedestrian walkway.
In return will enable the central avenue for the passage of vehicles.
Source: Ayuntamiento de Cartagena