Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Sauces again enjoy an expanded and renovated local, after 20 months of work (17/01/2009)

The mayor of Cartagena, Pilar Barreiro, alongside the president of the neighborhood association, Benito Martinez School, opened on the evening of Friday, January 16, the local expansion and renovation of social Sauces, on Calle Juan de la Cosa, where now the band 'Sauces' have a suitable place in which to test and the neighborhood, one of the most populous of Cartagena, you can have the room for multiple activities.

The Willows neighborhood association, one of the pioneers of the neighborhood movement, has now, 1,650 partners.

The event was attended by 300 people, which together with the delegation of council members, led by Councilman Decentralization, Nicolás Ángel Bernal, and directors of the association, as Luis Sánchez Pina, toured the new and refurbished facilities and attended several demonstrations by students of the taekwondo school, the band Sauces and a small group of cheerleaders.

After these works, the second floor of the building was equipped with a large rehearsal room with a stage right step for correct positioning of the musicians and the Director of the band.

You have created classrooms soundproof rehearsal room, music theory, policy room, meeting room and storage, plus separate toilet.

All rooms are fully soundproof rehearsal outside and independently of them.

Outwardly it looks like a wooden crate in yellow Formica.

It has also strengthened the foundation with micropiling and new shoes and other items.

The structure of the first floor has been reinforced with steel beams and has also built a new steel structure for the new plant.

Inside the building, due to the damages it has suffered since its construction, the building has completely renovated the interior woodwork repair, electrical installation (with new lights), has renovated the gym has been painted throughout the building and different rooms.

Has also given itself a new rush of water and electricity, and new electrical panels adapted to current regulations.

New toilets have been created for both sexes adapted for the disabled in all plants, as well as changing rooms for sports.

It has installed a large elevator, adapted for the disabled and for transporting musical instruments on the ground floor to the second, plus exterior painted building, fixing sidewalks and renovating an adjacent garden.

Finally, we have acquired completely new furniture in all rooms, offices, game room, dance room, arts and crafts, gym ...

The works have lasted about 20 months and the budget has been 780,000 euros.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información