Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Sale of recruitment the burial of the avenue in New Cartagena (10/01/2009)

The Ministry of Agriculture and Water of the Autonomous Community of Murcia has put out to tender the works of upgrading the urban stretch of the Rambla de Los Dolores Barrera passing through New Construction and Cartagena for a total of more than 10 million euro (EUR 10,642,029.34).

The project involves the excavation of the channel in a length of about 570 meters and 26 meters wide, ranging from the current round of Club 1900 to the sports of gymnastics.

Its surface will be put up as a grand boulevard landscaped around 15,000 square meters.

The last stretch to the Rambla entroque Benipila go uncovered.

Last December, Mayor Pilar Barreiro along with the Minister of Agriculture and Water Antonio Cerda had this project, which will help prevent flooding, to unite the two neighborhoods currently separated by the channel, creating one of the largest green areas municipality.

The deadline for execution of works is 18 months.

It will be recalled prior to the development of this project early last year made an investment of 700,000 euros for the substantial improvement of the drainage of rain water in the bottom of the gully, which allows rapid evacuation of water rain.

This project consisted of upgrading the intersection of Rambla Benipila Barreros with through the construction of a bridge consists of 9 spans.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información