The accident Angrois forced to reconsider all projects via a single platform
United Left-Greens in Cartagena not conceal his surprise and astonishment after hearing the Popular Party's commitment to the AVE reach Cartagena in 2016 This is because after the April 1, 2013 ADIF reconsider all high-speed projects who were not at the bidding stage regarding platform, security systems and soterramientos of cities, the project Arrival Arrival High-speed Cartagena, originally planned double track, electrification and signaling maximum performance, change the product budgetary infrastructure via a single platform, with mixed gauge (Iberian and European) which had to move goods and passengers nearby cuts.
However, United Left-Greens has learned that after the fateful accident and followed Angrois trial, ADIF has paralyzed all projects, as alleged in the stretch Murcia-Cartagena (single platform), for measures safety and rendered ineffective, not existing today do not even know what we want to do.
Therefore, you can only serve from the electoral alarm Popular Party playing to promise the arrival of the AVE in 2016, when there is not even study, subsequent project, drafting the EIS, budget allocation, bidding, awarding and actual execution of the work.
"What is clear is that the People's Party continues with the mirage of AVE while leaving investment in Cartagena-Chinchilla communication conventional train and reduces the performance and quality in the provision of commuter service," he declared Councilman Jaime Moltó Cayetano.
"Cartagena longer need widening and electrification in Cartagena-Chinchilla stretch that through conventional rail can be connected to Madrid by no more than three hours. Everything else is siren and electoral desperation," he concluded Councilman left formation.
Source: IU-verdes Cartagena