The City of Cartagena, through the Department of Infrastructure, launched Thursday a new wave of patching that incluyer fifty orders consistent work in the settlement of tunnels in several streets of the village.
The performance will last until Friday morning.
In this two trucks will be used with asphalt 3,000 kilos each.
Be prioritized and will begin to plug the holes that are more dangerous to the city, some of which are marked by the local police with cones to prevent accidents.
The street leading up to the old bullring, Captains Ripoll or Recoletos street in San Anton, are some of the pathways affected by potholes and cracks that will be resurfaced this action, in which l own neighbors will play a important role, since they are the first to detect potholes, call the Town Hall of the problem and request a solution.
The average time taken to solve each hole and cover the road is about ten minutes, although in practice be higher or lower depending on the size and depth of it, and always working so there is no cut traffic.
These actions refresher occur periodically and are not limited to the center of the city, but in the list of pending jobs patching of streets included in numerous districts and county like Los Barreros, the district of Conception , Los Dolores, Bohio, Slum Latin America, Media Room, Private Mediterranean, New Cartagena, Pearl District, St. Anton, St. Lucia, St. Felix Villalba, Virgen de la Caridad, El Algar, El Llano del Beal, La Palma, Pozo Strait, Isla Plana, Molinos Marfagones and the trough.
Source: Ayuntamiento de Cartagena