Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

The streets of the town moving in his set-up (18/04/2013)

Remodeling projects of several streets of the municipality that is carrying out the City Council through the Department of Infrastructure, advancing rapidly after cessation of the works during the festival of Easter, actions that affect both the center and the neighborhoods.

This applies to the work being undertaken on access roads to the Plaza de San Francisco, specifically in San Antonio the Poor, which has already run 70 percent of the work and is only a small stretch.

Currently being concreted the second and final tranche of road, starting tomorrow, is the stretch of sidewalk enlosará missing and is planned to be completed by the street over the next week.

Another front in the works, the renewal of drinking water systems and rainwater, and the remodeling of Juan Carlos I, in the Media Room, is performed in the absence of a stretch of sidewalk reaching the roundabout of Sorrows, so you have entered all the supply services and drinking water networks, on the surface, the median is over, have been placed lampposts, trees and plants, and is moving the front of the Repsol petrol station to fill it with a lane and sidewalk.

The forecast is that by the end of May, the avenue is remodeled.

A month later, in June, completed work on Titus Avenue Torreciega Didio, which has been extended to traffic court Cairn Street to mark the introduction of potable water lines, sanitation and collectors action that Seneca is on the street, leaving a stretch of about 70 meters of tubing.

Considering the progress of the works, in two or three weeks is expected to open to traffic crossing and, simultaneously, have begun demolition of sidewalks that will be finished with the remodeling of the environment.

FICO tra CUT at the station "N

Since this morning and for a few months, traffic will be cut off access to the Cartagena Train Station, due to construction of underground parking Avenida de America, who have advanced to the Plaza de Mexico.

Remember that for vehicles that need to access the Lidl supermarket area has enabled a lane and likewise has identified a space, while the works, will be located the taxi from the station.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información