Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Aquagest Work continues on the streets of García Lorca (12/01/2012)

This road remains closed to traffic on time now as she rides the tube corresponding to the network and performs general thrust of the Institute Jiménez de la Espada, and the implementation of four new scuppers for the collection of rain

The renovation of infrastructure in the sewerage system that is conducting Aquagest at the confluence of the streets Carlos III and Garcia Lorca, are moving towards the latter route with two lanes in the same direction, which has been cut traffic today .

Work is consisting of the location of services, since in this section have been located ONO, telephone, lighting and supply, which is hindering the assembly of the tube trench excavation, pipe installation and subsequent rush of Jimenez Institute Espada, in addition to performing well for sanitation, clogged the pipe installed, the execution of four scuppers and replacement of asphalt affected.

This action, which is conducting the concessionaire of the municipal water service since last Monday, has also affected traffic in the street Carlos III, now open to traffic, which has made ​​the most complicated part of the work and yet to put a scupper and asphalt, which is scheduled for a new break in the passage of vehicles next week.

Remember that this work of Aquagest seeks to renew the sewerage system with access to the Paseo Alfonso XIII, as the former was in poor condition.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información