The bridge of the Barrio de la Concepción is totally cut off to traffic on Thursday, October 13, as reported by sources from the Office of Local Police Traffic.
The performance of load tests carried out by the company that built the walkway, will force to stop the movement of vehicles in both directions, between nine o'clock and six o'clock in the afternoon.
The same sources have recommended drivers use alternative routes, but the main problem will be at the entrances to Navantia and Military Arsenal.
It will be recalled Bridge Design neighborhood is now a cut in their lanes, the output from Royal Street to Peroniño occasion of completion of the works of the pedestrian walkway.
Source: Ayuntamiento de Cartagena