Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

New court of traffic on the bridge of the Barrio de la Concepción to complete the pedestrian walkway (05/10/2011)

From 15:30 noon today, and for about a month, will be closed to vehicular traffic bridge Barrio de la Concepción, also known as Quitapellejos, to complete the construction of the footbridge.

Specifically, the lane closed to traffic in regard to the Calle Real, so that during this time will not be entering the city from the western districts of the bridge Quitapellejos.

However, it can be used to sense the lane in Barrio de la Concepción.

The residents of this area have alternative routes to enter the city as the bridge next to the Stadium Cartagonova Feringa Segastián street to the Shield, and the Alameda de San Antón.

The signal to alert the traffic court and indicate the alternative routes has been placed in the following locations:

- Rotonda del Cuatro Caminos, islet with Cyclamen street.

- Crossing the N-332 with Sebastian Street Feringa.

- Intersection of the street Peroniño Balcones - Peroniño with Pius XII,

- Pius XII Algameca Road

- Peroniño with balconies and Nardos,

Local police also prepared a special operation to monitor traffic especially at peak hours and hours of entry and exit of workers and the Military Arsenal Navantia.

This will have agents that will regulate traffic at the following intersections:

- Peroniño-Balconies-Peroniño-Pius XII - Pius XII, Ctra.

Algameca - Ctra Algameca-Jeanne Jugan, - In the rush hour traffic will be controlled with Rosique Soldier Alameda de San Antón.

If the development of the work permits, two lanes of traffic bridge would abris weekends.

After this last show will be completely finished the pedestrian walkway of the Bridge of the Barrio de la Concepción Avenue linking Pius XII with the Calle Real.

Remember that the gateway is about 58 meters long and four meters wide and is made of a metal frame and supported by an arc of nine meters high, placed finished in late July.

The last performance was the placement of the wooden platform and in this last phase will be the final shot of the bridge and unite with the bridge.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información