Work on the Auditorium and Congress Palace, both inside and outside the building are nearing completion in the absence of the finishing touches, details and finishes, as sources have indicated the direction of the work, so that the whole takes shape at a time.
The urbanization of the environment, very late, and shows virtually installed fir stage of 20,000 square meters around the auditorium as well as palms, ficus, benches, lampposts and other gardening items and furniture that complement the outer zone.
Remember that this flooring is placed in such a way that allows water cirucular below, which will prevent the ponding area.
Furthermore, it has identified an area of sand designed to playgrounds and in the line marked by the City Council to implement the idea of increasing access to municipal buildings, the Auditorium and Convention Centre will have a suitable itinerary for the blind and Disabled.
Source: Ayuntamiento de Cartagena