Work on the new pedestrian access to the Hospital of St. Lucia from Minaret Street, near the morgue Serfusa in Lo Campano, whose construction began two weeks ago, will be finished in two weeks, as reported by the Councillor for Infrastructure, José Vicente Albaladejo, who already announced that this action would be implemented within a month.
This is a sidewalk of 320 meters long and 1.6 meters wide, which refers to the pavement of the roundabout to access the new hospital.
They already have placed the curb and the floor is concrete, focusing the work in laying the tile gray hydraulic skid pad.
In addition, eleven are to be placed streetlights, in line with those prevailing in the area, which illuminate the journey on foot.
With this are two new access granted walk to the hospital.
The other is the pedestrian sidewalk that connects the stop FEVE to the hospital, which has been operating since last January.
In turn, these actions are in addition to other measures taken by the City to provide citizens with the arrival at Santa Lucia, as is the launch of a new bus line, number 18.
Source: Ayuntamiento de Cartagena