Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

Cut traffic by Severo Ochoa works for three weeks (10/01/2011)

Local Police proceeded Cartagena today signaling that affect traffic court today and during the next three weeks to users of the Plaza de Severo Ochoa, during the first phase of the project works to channel storm being carried out by the concessionaire of water supply, Aquagest, towards the district Virgen de la Caridad.

Given the importance of this roundabout and the traffic density, connecting major arteries in and out of the city, such as Ronda Norte, Jorge Juan, Ã ngel Round Bruna and Union City, Aquagest has decided to start work here and finish as soon as possible, with estimated completion in less than a month, but technical problems.

Thus, the local police has started early in the morning to signal the traffic court that it is effective and affects the length of the service station, both within the roundabout, where the two current one-way lanes disappear and become one entrance and one exit, and with signs at junctions and roundabouts close (Reina Victoria, Ronda Union City, Juan Fernandez), in reporting on alternative routes to avoid collapsing the space vehicles.

These works, which are included in the stormwater pipeline project in the neighborhood Virgen de la Caridad, are aimed at the burial of a large water pipe log about two feet in diameter, so that, before the arrival of Heavy rains, flooding can be avoided in the surrounding streets.

Source: Ayuntamiento de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información