As a result of the renovation of water infrastructure and urban services to be launched by the City of Cartagena by the concessionaire Aquagest from today November 29, during a period of three months, will be closed to traffic the last stretch Juan Fernandez Street, between Trafalgar streets and Jorge Juan, as reported by the Centre for Integrated Local Police Traffic.
The same sources have indicated that during the first 15 days will be closed to traffic Trafalgar Street, from street to street, Juan Fernández de Guimbarda Ussery, and Juan Fernández street from Trafalgar roundabout to the roundabout at Calle Jorge Juan .
Neighbors concerned may enter the short end of the street down the street Trafalgar Ussel of Guimbarda, compared to the Municipal Sports Pavilion.
Subsequently, the Rotunda will open the Juan Fernandez and Trafalgar streets, passing the traffic on the latter street.
Juan Fernández Street will be closed at this point throughout the work.
Avenida de los Toreros be closed to traffic when it is not possible to cross the street Juan Fernandez, marked appropriately to allow the passage of residents and services.
Users of affected garage access will be provided, to the extent possible.
When you can not be well, they communicated through signage, mailshot or ownership of property.
The stops of the urban transportation lines will be affected is the street Carmen Cande, at the same height as affected by the works.
Local police have been advised to use alternative routes as the Alameda San Antón, street angel and Round Bruna Union City, avoiding the street Juan Fernández, up the junction of the Avenida Reina Victoria, if we are to move towards the Barrio Pear or to Los Barreros.
Source: Ayuntamiento de Cartagena