The City of Cartagena is about to complete the works of channeling a large network of about 15 kilometers of optical fiber for interconnecting a score of 20 municipal buildings, traffic lights next to the network, control rooms and different intelligent urban furniture such as bicycles loan service Bicity, the bollards for pedestrian access to Old Town or the ticket machines of the ORA.
The long list of municipal offices will be connected to this modern data transmission at high speed it up: Security Park, the Cultural Center Luzzy Ramón Alonso, Building Education Services, Statistics and Consumption in Ronda street La Union, the Municipal Tourism Office, House of Youth Rehabilitation Center in the former College Carmen Conde, Municipal Pool Deck, the Municipal Sports Pavilion, the future Palace of Sports, Municipal Archaeological Museum, the Municipal Archives Artillery Park, the Center for Integrated Transport, the building of the Miracle, the new administrative headquarters of San Miguel, the Palace Hall, the Agency of Local Development and Employment, the building of The Graduate, Social Services in the Plaza of Spain The future Auditorium and Congress Palace, the Municipal Stadium and the exhibition festive Carthagonova of Carthaginians Romans.
As explained Councillor for Infrastructure and Services, José Vicente Albaladejo, this modern technology will allow a total flow of communications and savings in local telephone bill, to have a home network.
It may get to transmit pictures, especially those from traffic cameras of the local police to control remotely from the operating room, the different color light intervals.
It will also be connected to this municipal domestic telephony network, the surveillance cameras of the parties and control access to areas of the historic pedestrian and bicycle retailers Bicity.
This network will be incorporated shortly Admas retailers of the ORA, which give direct information on their collection.
KILA 15 'FEET OF FIBER Ã "OPTICAL
The works have been running for a year, through two projects of Plan E, with a total iversión 1.5 million euros.
Have been used 15 km of meters of fiber, but are open ditches along six miles and has been used already existing municipal pipes were fitted at the time.
According to Albaladejo, along this September will be held the last trench that will focus on Gisbert Street to service the Auditorium and Congress Palace.
There are currently works in the Serreta between the Agency of Local Development and Employment and Gisbert Street in Park Street at the corner of the Plaza de Juan XXIII Santa Florentina Street and the Square of Spain, between the 2001 and the station building.
Parallel and have begun to enter the optical fiber by these underground channels and is expected that all of them may already be in service later this year.
The works have been done without just noted, the councilman said, slowly opening and replacing the surface with care to avoid patches.
NO MÃ S WORKS
Another major advantage of this new network, recalled Albaladejo, is that planned and executed with sufficient amplitude that can be used by other operators and mobile media services.
As explained by the council, from now, the areas where runs no more trenches may be opened and businesses should necessarily use the municipal system by paying a fee.
Also has begun to force the operators that use the facades, remove and move to the municipal pipes.
All this not only avoid inconvenience to citizens, but that it is in the aesthetics of buildings, especially the Old Town, has completed the councilman.
Source: Ayuntamiento de Cartagena