Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

[The Casa Rubio waits three years for the preparation of a study by the UPCT for its restoration (30/12/2020)

| The Cartagena City Council commissioned an architectural report from the Polytechnic University for the rehabilitation of the main building of The Algar | A people fed up with promises.

The residents of El Algar show their anger at the soap opera in which the restoration of the main building of the council has become.

Three years ago, the City Council commissioned a study for its rehabilitation at the Polytechnic University of Cartagena.

No news on the evolution of its writing has been offered by both public bodies so far.

A delay that only means the umpteenth setback to a string of ads that always came to nothing.

The current Councilor for Citizen Security and Public Road, Juan Pedro Torralba, together with the Councilor for Culture, David Mart nez, and the then Councilor for the Archaeological Heritage Area, Ricardo Segado, the first two from the PSOE and the third of MC, announced the commitment to complete recovery of the historic property in September 2015, more than five years ago.

The councilors even spoke of future uses for it, such as the transfer there of the OMITA office, social assistance, the premises of the Local Police barracks, a library or even the headquarters of the different cultural and cultural associations.

sports of El Algar.

The MC / PSOE municipal government team, with Jos L pez as mayor, also announced a first installment of 30,000 euros in the 2016 budgets that at no time reached any specificity in municipal accounts for that year.

Already in December 2017, the signing of an agreement between the local Administration and the UPCT that includes the preparation of a report that dictates the guidelines in the architectural intervention required by the historic property will take place.

rico.

The Casa Rubio, together with the Apolo Theater, forms the two emblematic samples of modernism in the El Algar county council.

Imposing its elevation, with two floors with an attic, in the center of the town with measures disproportionate to its surroundings with more than 2,000 square meters of surface.

Its construction concluded in 1895 and its owner, a famous miner, wanted to leave a trace of his economic and social status similar to other constructions of the time such as the Aguirre Palace, in the historic center of Cartagena, or the Casa del Piñ n in La Uni n.

function { ;(, , {});}

Source: Partido Cantonal de Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información