The parking of the Cartagonova Stadium to be used in the next game of Cartagena and during the Carthaginian and Roman festivities that begin on Friday, will recover normal Monday, after the City Council through the concessionary company Lhicarsa has removed the mud and cleaned the firm.
This morning there were the last touches with pressurized water machines and sweepers, while the mud was concentrated on one side, on several motons, for drying and subsequent removal, since it is impossible to transfer it wet.
The parking lot, in which a large amount of water had stagnated during the cold drop episode last Friday, will remain operational today.
The camp area is also clear to continue with the installation of the troops and legions, as well as the fair, in which the first attractions have begun to be placed under the supervision of municipal technicians.
The mud has also been removed and the area that had been flooded in Peroniño Street was cleared, at the height of the ascent to the Watchtower Castle.
Source: Ayuntamiento de Cartagena