Portal de Cartagena

www.portaldecartagena.com

Cartagena  - SpanishCartagena  - English
detail of Cartagena

 

MC gets the unanimity of political groups and civil society to demand from the regional and central governments the arrival of the AVE without strangulating the growth of the municipality or isolating neighborhoods (07/06/2018)

This morning, the Plenary Session of the Municipality of Cartagena, at the proposal of the CM, has unanimously declared to demand that the regional and national governments rectify their decision to impose the arrival of the AVE to Cartagena on the surface and within a period of time , now, they have postponed until 2023.

It is worth remembering that last May 28, during the meeting of the Board of Directors of the Cartagena Alta Velocidad company, the two superior administrations agreed on an option that would suppress and corrode Cartagena.

A day later, MC Cartagena requested the Mayor's Office to hold a monographic plenary session to demonstrate the positioning of the Corporation before the institutional alliance that validates the natural growth of the municipality.

Before the celebration of the Plenary, the spokesman of the Cartagena training, José López, has wished the arrival of "a railway of the 21st century, in the same conditions as the rest of Spain." Let the Ministry of Public Works assume the expense and the same characteristics as in all cities, without blocking a municipality, and that does not suit someone's interests to prevent the ZAL of Los Camachos from developing. "

"It is a very important step (the plenary pronouncement) to join and say no to what is imposed, a declaration so that no one returns to lurching or make excuses as time, because they are already seventeen years behind. the Cartagena we are going in the same direction, "he concluded.

Unanimity of the Corporation

In this context, the plenary statement led by MC, which has collected all the proposals promoted by José López from the Mayor's Office, has had the support of the rest of the political groups and social groups with greater representation.

All have transferred to the Board of Directors of the Cartagena High Speed ​​SA Society, the need for the preparation of a technical proposal for the remodeling of the railway arterial network of the municipality of Cartagena.

Thus, the Board of Directors of the company has been urged to the following actions:

That the proposal does not generate walls that divide the municipality in two, that does not strangle the growth of the city and its neighborhoods and councils, and that bet on intermodality.

Also, that includes the elimination of the steps at the level of La Palma-Pozo Estrecho;

Alumbres;

Vista Alegre and Los Mateos;

and the commitment that the rail line will not cross any population center and that the FEVE line will be removed as it passes through Vista Alegre and Los Mateos, transferring the FEVE station to that of Víctor Beltrí.

This technical proposal should also include the following needs program:

Remodeling and protection of the Cartagena station building, adapting it to the performance of a high-speed line and intermodality.

Access to Cartagena station by a new rail corridor that runs through the east of the city of Cartagena, integrating the Railway Arterial Network to the urban development forecasts of Cartagena, by burying those sections that run through urban land and developable.

Possibility of rail access to the future Logistics Activities Area of ​​the Los Camachos Industrial Area.

Connection with the industrial zone of the Valley of Escombreras and construction of a variant to the urban center of Alumbres to avoid the current passage of dangerous goods.

Temporal optimization of the procedure of processing, coordinating it with the action of Connection of high speed Murcia-Cartagena.

Split of the lines of passengers and merchandise from Beniel to Cartagena due to the current traffic and to which it is planned.

To urge the Board of Directors of the Cartagena High Speed ​​SA Society to convene a meeting to analyze the proposed modification of the railway arterial network of the municipality of Cartagena and the Cartagena station, indicated in the previous sections, and its comparison with the proposal of the Informative Study of the Remodeling Project of the railway arterial network of the city of Cartagena, as well as with the proposal of the agreement of the Board of Directors of the Cartagena Alta Velocidad SA Society of May 28, 2018.

A viable and future solution for Cartagena

MC defends that the viable and favorable solution for the future of Cartagena goes through the arrival that guarantees the intermodality, the integration of the neighborhoods and the connection of the Port and the ZAL, taking up the proposal of diverting the lines towards the surroundings of Los Camachos and work in parallel to the La Unión highway from El Borricén.

A railroad that reaches Cartagena, without lastarla or imprison it.

Do not block any neighborhood or there are level crossings.

And that if it had to transit through a locality that is executed an elevated or buried step.

Also, that in the first instance it reaches Los Camachos and that, from there, it is diverted to both Escombreras and Cartagena.

The priority is to avoid constricting eight neighborhoods, something inevitable if the green light is given to the option imposed by CARM and the Ministry

Source: Grupo municipal MC Cartagena

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información